Loft Conversions from £8000- £20,000

Estimated time taken 4 to 6 weeks depending on loft size

For this project, building regulations are required, but planning permission is not required.

What’s involved?

Installation of steel work to front and rear of loft space, to provide support for new floor.

Installation of floor joists.

Fit velux windows and escape windows (as required)

Build stud walls to form rooms as needed

Insulate and plasterboard all walls and ceilings.

Skim all walls and ceilings to a smooth finish

Joinery

Staircase or pull down ladder (as requested)

Doors, skirting boards, architraves to match existing

Electrics

Carried out by a Part P Approved electrician

Sockets, light switches, smoke detectors as needed

Plumbing

Carried out by a Gas Safe Approved plumber

Radiators, en-suite bathroom as needed

Project details

  • Estimated time taken

    4 – 6 weeks (size depending)

  • Cost

    £8,000 – £20,000